Building a grid system using WS-Resource Transfer, Part 5: Using WS-RT for work distribution


The fifth and final part of my series on using WS-Resource Transfer is available to read now. In this last part we look at using the WS-RT system as a method for distributing work within your grid system. Read Building a grid system using WS-Resource Transfer, Part 5: Using WS-RT for work distributionRead past parts of the series: Read: Building a grid system using WS-Resource Transfer Series